UK: A leaked report by the by fire investigation specialists BRE Global has blamed a poor cladding refurbishment on a lethal fire at the Grenfell Tower in London on 14 June 2017. The document, leaked to the Evening Standard newspaper, found multiple deficiencies in the installation of the windows, cavity barriers and cladding system, and their failure to meet building regulations.
The report described insulation used in the refurbishment as ‘combustible’ and said that it provided a medium for the fire to, ‘spread up, across and within sections of the façade.’ BRE noted that the 75mm insulation foam used on most of the spandrel beams had, ‘no markings to identify the manufacturer of the foam.’ The Evening Standard says that 100mm Celotex foam insulation was also used in the columns but that the BRE report does not further distinguish between the two types.
71 people were killed in the fire that took place on 14 June 2017. The draft BRE report was submitted to the Metropolitan Police Service as part of its investigation.