UAE: Michel Francis, chief architect at DEC consultants, has recommended that ‘intensive’ inspections, including checking that insulation is properly installed, could help to prevent the spread of fire in high-rise buildings in Dubai. He pointed out that a fire could propagate rapidly if there were gaps between fire-resistant mineral–based insulation. Francis’ comments at the Windows, Doors and Facades Forum in Dubai were covered by the National newspaper.
"An inspector must look for these holes, see how the mineral wool is installed, the fixtures used, check for any intricate gaps between the intersection of slabs. An expert auditor would look to see if there are any loopholes. These locations and intersections, if well treated, will prevent the jumping of fire from one floor to the other and the whole facade catching fire. Fire containment would be much easier," said Francis.
New provisions in the local Fire and Life Safety code are due to be released later in 2016 requiring owners to renew a no-objection certificate annually after inspections to ensure all modifications are fire-safe. The changes in the regulations follow a string of fires in high-rise buildings in the city in the last few years.