Insulation industry news from Global Insulation
Germany: Grenzebach says that it has completed the construction of the Hütten wood fibre insulation plant in Bavaria's Neustadt an der Waldnaab District for Ziegler Group subsidiary Naturheld. The plant took a total of 12 months to build, and will run on 100% renewable energy. Naturheld will use waste wood from Ziegler Group's wood processing operations in the region. Grenzebach says that it developed a novel wood blending system for implementation at the plant. The supplier said that the plant has a wood fibre production capacity of 6t/hr, and is capable of expanding to 10t/hr. The plant gives Ziegler Group the capacity to produce 1.5Mm2/yr of its wood fibre insulation product.
Managing director Stefan Ziegler said "Building the wood fiber insulation board plant within such an extremely short period was possible only thanks to the close cooperation with a renowned automation partner of international standing like Grenzebach. As a solution provider, Grenzebach supplied both the necessary product and technical know-how and expertise and was able to make the required capacities available at all times."