Insulation industry news from Global Insulation
UK: Knauf Insulation plans to upgrade two of its glass wool insulation plants in the UK at a cost of Euro53.7m. The upgrades consist of a packaging equipment upgrade at the Cwmbran, Torfaen, insulation plant and the replacement of the furnace and connected equipment at its St Helens, Merseyside, insulation plant, as well the acquisition of land adjacent to the latter from NSG Group. As a result of its upgrade, the Cwmbran plant will begin producing insulation slabs as well as rolls and blowing wool. The company said that the investments are a response to anticipated glass wool insulation demand growth on the back of the government’s Future Homes Standard energy efficiency policy.
Managing director Neil Hargreaves said “This series of investments will boost capacity as well as improve the range, availability and sustainability of our products.”
Angren Insulation secures US$5m loan from European Bank for Reconstruction and Development for upcoming Tashkent glasswool plant
22 October 2021Uzbekistan: The European Bank for Reconstruction and Development has issued a US$5m loan to Ecoclimat Group for the launch of a new subsidiary, Angren Insulation. The company will use the loan to build a 32,000t/yr glasswool plant in Tashkent. The plant will use recycled glass as an input and reduce the group’s CO2 emissions by 85,000t/yr. The insulation producer said that it will help it to meet the growing local demand for mineral-based insulation.
Fletcher Building stops glass wool insulation production
07 September 2021New Zealand: Fletcher Building has suspended the production of its Pink Batts glass wool insulation at its plant in Canterbury region due to Covid-19 lockdown measures. RNZ News has reported that New Zealand entered Covid-19 lockdown level 4 in September 2021. As a result of the closure, Pink Batts insulation is in ‘extremely limited’ supply, including in the Auckland market.