France: Knauf Insulation entered production at its new 0.1Mt/yr mineral wool plant in Illange on 22 October 2019. Knauf Western Europe managing director Mark Leverton called the plant, which cost Euro110m and will employ 123 people, a ‘reference plant’ for the group ‘in terms of its approach to the environment and the wellbeing of employees.’ The group reported that 7.5ha has been set aside for a wildflower meadow, with Urbanscape Green Roof installed across plant buildings.